Entity
  • Accelerated Bridge Construction University Transportation Center (ABC-UTC)

    Created in 2011


  • Up & running (A)
    Existing signals show a regular activity
  • Social networks

    96 501
  • Activities

  • Entity types

  • Location

    10555 W Flagler St, Miami, FL 33172, USA

    Miami

    United States of America

  • Employees

    Scale: 11-50

    Estimated: 6

  • Engaged catalyst

    0
    0 0
  • Added in Motherbase

    6 years, 7 months ago
Description
  • Value proposition

    The broad objectives of the Tier I Accelerated Bridge Construction University Transportation Center (ABC-UTC) are to advance the frontier of Accelerated Bridge Construction (ABC); develop new ABC knowledge; effectively transfer the state-of-the-art ABC knowledge to the profession; develop a next-generation ABC work force; and collaborate with the Federal Highway Administration (FHWA), the American Association of State Highway and Transportation Officials (AASHTO), Departments of transportation (DOTs), other UTCs, and the transportation profession to make ABC the best solution for the nation’s aging bridge infrastructure in line with U.S. DOT’s strategic focus on State of Good Repair.

    Bridge Engineering, Civil Engineering, and Bridge Construction

Catalyst interactions
Catalyst TypeTweets Articles
No interactions
Social network dynamics
Loading...